Porter Square Cambridge Ma Nauset Completes Mixed-Use Development: Massachusetts Homebuyers Homeowership

Cambridge, MA – Nauset Construction has completed St. James Place, a mixed-use, transit-oriented development that links the historic St. James Episcopal Church to 46 condominiums, 2,000 square feet of retail space, and a new parish hall that includes a neighborhood food pantry.

Located at 1991 Mass. Ave. in the heart of Porter Square, the development has a Walk Score of 93 and is just steps from the MBTA Red Line station, a host of shopping and dining options, as well as three local parks. The new community also adds much-needed housing stock to the City of Cambridge while providing stability to an institution that provides critical services to those in need.

St. James Place was developed by Acorn Holdings in partnership with the St. James Episcopal Church, transforming the site of a shuttered car wash into housing and replacing an inaccessible and deteriorating parish hall with a new 11,400 square-foot structure. The hall houses classrooms for children’s programs, a nursery, library, and music practice rooms as well as a commercial kitchen and the neighborhood food pantry. The development also includes a private courtyard that is open to the public, providing welcoming greenspace – which is in short supply in Porter Square.

“This project creates an architectural highlight for the neighborhood that ties directly into the history of Porter Square,” said Phil Terzis of Acorn Holdings. “The condominiums help to meet the demand of this supply-constricted market, while the courtyard re-creates that historical feel of a classic cloister. And it’s one of the few if not the only – publicly accessible, privately-owned greenspaces in Porter Square.”

The stone veneer-lined foundation of the condominiums creates a seamless connection to the historic church (built in 1888 in the Richardsonian Romanesque style and listed on the National Register of Historic Places). The three floors of condominiums situated above the parish hall consist of 11 one-bedroom, 34 two-bedroom and two-bedroom/den, and 1 three-bedroom units, including five affordable units. The condominium units feature quartz countertops in kitchens and bathrooms, Bosch stainless steel kitchen appliances, and energy efficient LED lighting, as well as additional energy saving features designed to meet the stringent City of Cambridge LEED-based construction standards for energy efficiency and sustainability. Building amenities include an entry-level common entertainment room with wet bar, a guest suite for exclusive use by residents, a pet spa, and electric vehicle charging stations located in the below-grade parking garage.

St. James Place was a challenging development from many perspectives, and its success is directly correlated to all of the firms involved. One of the many construction challenges was connecting the new structure to the historic church, as well as excavating for the below-grade parking garage, all while ensuring that its cobblestone foundation was properly supported and not compromised throughout construction. “This was a project that played to our strengths as a construction manager – historic renovation, midsize multifamily housing and working in tight urban infill locations,” said Benjamin Goldfarb, Vice President of Nauset Construction.

St. James Place is the third Cambridge multifamily project on which Nauset and Acorn have partnered. Nauset constructed 7 Cameron, a 37-unit apartment community near

 


 

firsttimehomebuyers | homebuyer real estate buyers broker

FIRST TIME HOMEBUYERS


 


Article From: "Boston Real Estate Times"   Read full article

Get Started with MABA

For no extra cost, let a MABA buyer agent protect your interests

800-935-6222 Call now!

Pin It on Pinterest